Project

CONSTRUCTION OF THE NICHUPTÉ VEHICULAR BRIDGE, IN THE STATE OF QUINTANA ROO.

Sector: Transport


Last Revision

June 17, 2025
Short Name of the Project:
0799 Nichupté Vehicular Bridge
Type of Investment:
Greenfield
Subsector:
Highways / bridges
Asset (s):
 Bridge 11.20 KM 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

8,586,000,000

Estimated Investment USD:

464,108,108

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Construction

DESCRIPTION

Construction of the "Nichupté Vehicular Bridge" with a length of 8.8 km, over the lagoon of the same name. It includes junctions at Boulevard Luis Donaldo Colosio and Boulevard Kukulkan, in the municipality of Benito Juárez, Quintana Roo, as well as the necessary engineering studies and the executive project.
With a bike path, a system of walkways and lighting, as well as an 'arch' bridge; it will be equipped with intelligent transportation systems (ITS) connected to a security C4, a bike lane, and stops, as well as a cross-section of 14.9 meters to accommodate 3 lanes of traffic, one for each direction of travel and another that will be reversible, depending on traffic demand.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Public Works
Selection Process
International Tender Under Treaty
Payment Source
Budgetary

STATUS

Stage
  Execution
RELEVANT DATES
Ministry of Finance Registration or equivalent March 04, 2022
Execution/Construction Starting Date 2022
Operation Starting Date December 2025

GEOLOCATION

State(s)
Quintana Roo   

SPONSOR

Responsive image
Entity
Secretaría de Infraestructura, Comunicaciones y Transportes
Department
Dirección General de Carreteras

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

It consists of the construction of an 8.80 km vehicular bridge over the Nichupté lagoon system. Its objective is to improve mobility and serve as an alternate route between the hotel zone and downtown Cancun. Among its benefits are the rehabilitation of mangroves and the reduction of travel times.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Transparencia Presupuestaria
Description
Digital platform used to monitor public expenditure, as well as the execution of public works throughout the country.
ID
22096430001
Website
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
23QR2022V0008
Permits
Responsive image
Source
State Government

REMARKS

Investment amount information taken from the conference held at the National Palace on June 25, 2025, in which an amount of $6,486,000,000 is mentioned up to 2024 and $2,100,000,000 in 2025.

On January 11, 2022, the Strategic Projects Agency of the State of Quintana Roo (AGEPRO) announced that the project will be executed in the federal order through the Secretariat of Infrastructure, Communications and Transportation (SICT), signing the first agreement between this instance and AGEPRO on December 21, 2021 to deliver the file information generated to date. On January 29, 2022, a coordination agreement was signed between the Federal Government and the State Government.