DESIGN, EXECUTIVE PROJECT, CONSTRUCTION, EQUIPMENT AND OPERATION OF THE INTEGRAL MOBILITY MODEL OF THE SOUTH ZONE OF THE METROPOLITAN AREA OF GUADALAJARA (LINE 4), IN THE STATE OF JALISCO.
Sector: Transport
Last Revision
December 15, 2025
Short Name of the Project:
0914 Integral Mobility Model of the South Zone of the Metropolitan Area of Guadalajara (Line 4)
Type of Investment:
Brownfield
Subsector:
Urban Mobility
Asset (s):
Electrified double track 21.16 KM, Electric Train 12, Stations 8, Control and Collection System
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
11,281,000,000
Estimated Investment USD:
584,507,772
Banobras/Fonadin involvement
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
Design, Construction, Equipment, Operation