Project

Construction of a new section for the Tamazunchale Bypass, from km 0+000 to km 9+564, including the construction of the “Palictla I,” “Palictla II,” and “Moctezuma” bridges, “Totectitla” at-grade interSECTION AND “Las Lomas” grade-separated interchange, IN THE STATE OF SAN LUIS POTOSI

Sector: Transport


Last Revision

July 30, 2026
 
Short Name of the Project:
1090 Construction of a new section of the Tamazunchale Bypass from km 0+000 to km 9+564
Type of Investment:
Brownfield
Subsector:
Highways / bridges
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
  Construction

DESCRIPTION

The works covered by this project comprise the following:

- Construction of a new roadway section for the Tamazunchale bypass (from km 0+000 to km 9+564) to accommodate two traffic lanes over a length of approximately 9.564 km. This involves widening the existing roadway by constructing two 3.50-meter-wide lanes, along with a 3.00-meter-wide inner shoulder and a 3.00-meter-wide outer shoulder in both directions of travel; a 2% cross-slope (camber) toward the outer shoulders is required. The project includes earthworks, drainage structures, pavement, structural works, ancillary works, and signage.
- Construction of the “Palictla I” (km 2+469.7), “Palictla II” (km 2+611.7), and “Moctezuma” (km 3+200) bridges, as well as two interchanges: “Totectitla” (km 0+000, at-grade) and “Las Lomas” (km 9+400, grade-separated).
These works will be carried out in the municipality of Tamazunchale, in the state of San Luis Potosí.

Bidders must ensure that the national content—comprising materials, machinery, and permanently installed equipment used in the execution of the works—accounts for 30% of the project's value. Additionally, bidders must ensure that local labor accounts for a minimum of 30% of the workforce employed for the works or services to be performed.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  Investment in Strategic Infrastructure for Development with Welfare
Term
4 years
Selection Process
International Tender Under Treaty
Payment Source
Budgetary
Deferred compensation pursuant to Article 82 of the LFFIEDB, chargeable to budgetary resources authorized in the Expenditure Budget for the corresponding fiscal year during the term of the Contract, in accordance with Article 45, Section I of the RLFIIEDB.

STATUS

Stage
  Bidding
Substage
  Proposal Development
RELEVANT DATES
Request for proposals/Announcement July 24, 2026
Proposals Reception August 25, 2026
Ruling September 10, 2026
Contract Signing September 14, 2026
Execution/Construction Starting Date September 17, 2026
Term of the Contract December 31, 2030

GEOLOCATION

State(s)
San Luis Potosi   

SPONSOR

Responsive image
Entity
Secretaría de Infraestructura, Comunicaciones y Transportes
Department
Dirección General de Carreteras

ADDITIONAL INFORMATION

Line
Source
Proyectos estratégicos MX
Portfolio ID or Key
FP-09-210-009000999-T-3-2026
Tendering process

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice