Project

DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A WIND POWER PLANT IN THE STATE OF TAMAULIPAS.

Sector: Electricity


Last Revision

February 01, 2024
 
Short Name of the Project:
0536 CENACE: 2nd Long Term Power Auction (SLP-1/2016) Salitrillos
Type of Investment:
Brownfield
Subsector:
Wind Power
Asset (s):
 Wind Farms 110 MW 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

2,798,000,000

Estimated Investment USD:

163,625,730

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation,  Operation,  Maintenance

DESCRIPTION

The project consists of the design, construction, equipment, installation, operation and maintenance of Salitrillos eolic power plant with a total production capacity of 110 MW in the state of Tamaulipas. The plant has the following features:
Power Zone: National
Export Area: “Noreste”
Export Subarea: Noreste-Tamaulipas
Price Area: Reynosa
Interconnection Zone: AEROPUERTO AER-138

Contract number: SLP2016010040-08 related to:
- Energy for 399,129 MWHr/Year during 15 years and Renewable Energy Certificates (CEL) for 399,129 CEL/Year during 20 years, with an offered price of MXN$244,612,322.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Private
Type of Contract
  Assignment
Term
15 years
Selection Process
Public Auction
Financing Sources
Private
100 %
MXN
2,798,000,000
USD
163,625,730
Payment Source
Project revenues / Rate
Electric Coverage Contract between “Suministro Básico” (Public Service Regulatory Entity) and the Generator.

STATUS

Stage
  Operation
Substage
  < 5 years of operation
RELEVANT DATES
Request for proposals/Announcement April 29, 2016
Proposals Reception August 01, 2016
Ruling September 28, 2016
Execution/Construction Starting Date January 09, 2018
Operation Starting Date January 29, 2021
Term of the Contract 2036
Contractor
Enel Green Power México  
Major Contractor’s Shareholders
Enel

GEOLOCATION

State(s)
Tamaulipas   

Entity in charge of controlling the possession of communal land, as well as providing documentary legal security derived from the application of the Agrarian Law, and is the operator of the Geospatial Information System (SIG).

SPONSOR

Responsive image
Entity
Private
Department
Enel Green Power México

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The purpose of the project is the generation of clean electricity from a wind power plant, as well as the maintenance of general works of the Salitrillos Wind Farm, in the state of Tamaulipas, in order to satisfy the electricity demand of the Northeast region of the country.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
28TM2017E0030
Permits
Responsive image
Source
Centro Nacional de Control de Energía
Description
Public entity whose objective is to exercise operational control over the national electric system and the operations of the wholesale electricity market, and to guarantee impartial access to the national transmission network and to the general distribution network
Responsive image
Source
Comisión Reguladora de Energía
Description
The Energy Regulatory Commission is an independent regulatory entity that fosters the efficient growth of the sector, as well as of a reliable power supply. Its mission is to regulate the activities of the power industry in a transparent, impartial, and efficient manner, in order to generate the required certainty that encourages productive investment, promotes healthy competition, and generates an adequate coverage of services.
ID
E/1883/GEN/2017
Permit
ID
PROEMIO: E/1883/GEN/2017
Resolutions Additional Information

REMARKS




Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice