Project

EXECUTION, EQUIPMENT, AND COMMISSIONING OF THE GUADALUPE LAKE DAM WATER UTILIZATION SYSTEM IN THE STATE OF MEXICO.

Sector: Water and Environment


Last Revision

December 29, 2025
 
Short Name of the Project:
1041 Lago de Guadalupe Dam Water Utilization System
Type of Investment:
Greenfield
Subsector:
Water Supply
Asset (s):
 Drinking Water Treatment Plant, Supply Line 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

2,784,956,112

Estimated Investment USD:

144,298,244

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
  Construction,  Equipment

DESCRIPTION

The project consists of the execution, equipment, and commissioning of the Lago de Guadalupe Dam water utilization system through a Public Works Contract under a mixed payment condition, with one part based on unit prices and the other on a fixed price (lump sum), taking into consideration the established scope of work (catalog of concepts).

Some concepts included in the catalog are:
- Intake Structure
- Conveyance Line from the Intake Structure to the Water Treatment Plant
- Conveyance Line from the Water Treatment Plant to the Metropolitan Line Interconnection
- Special Crossings
- Interconnection with the Metropolitan Line
- Water Treatment Plant (Architectural, mechanical, and electrical projects, buildings, among others)
- Conveyance Line to La Caldera Tank CDMX
- Basic Engineering
- Laboratory Equipment
- Water Treatment Plant (Instrumentation and Control)
- Commissioning and Stabilization
- Development of Executive Project (or Detailed Engineering Project)
- Additional Concepts.

The detailed scope of work (catalog of concepts) and other bidding documents can be consulted in the "More Information" section.

LEGAL AND FINANCIAL STRUCTURE

Type of Contract
  Public Works
Selection Process
Open Domestic Bidding
To cover the expenses arising from the contract subject to the bidding process, the Technical Committee of Trust No. 1928, named "Para Apoyar el Proyecto de Saneamiento del Valle de México" approved the allocation of resources to Conagua.

STATUS

Stage
  Execution
RELEVANT DATES
Request for proposals/Announcement November 28, 2025
Proposals Reception December 12, 2025
Ruling December 24, 2025
Contract Signing December 30, 2025
Execution/Construction Starting Date December 31, 2025
Term of the Contract June 23, 2027
Contractor
Grupo Impulsor Pajeme, Construcom Infraestructura y CIPRO, Proyectos e Infraestructura Civil  

GEOLOCATION

State(s)
State of Mexico   

SPONSOR

ADDITIONAL INFORMATION

Responsive image
Source
Compras MX
Description
Compras MX is the Digital Public Procurement Platform of the Federal Public Administration, where anyone can access information about the purchases made by the Government of Mexico to support its operations for the benefit of all.
ID
LO-16-B00-016B00985-N-258-2025
Tendering process
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
27TA2025H0061