Project

RESERVA ZAPOTLAN ECONOMIC DEVELOPMENT POLE FOR WELLBEING (PODECOBI), IN THE STATE OF HIDALGO.

Sector: Industry


Last Revision

July 29, 2025
Short Name of the Project:
1005 PODECOBI Reserva Zapotlán, Hidalgo
Type of Investment:
Greenfield
Subsector:
Industry
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Construction,  Administration

DESCRIPTION

PODECOBI are articulated productive ecosystems, where the State acts as an investment promoter, a driver of local capacities, and a facilitator of public and
logistical services. They are designed to boost economic activity and foster shared prosperity through economic and social impacts.

The Reserva Zapotlan PODECOBI covers an area of 910.82 hectares, which meets the selection criteria established in the Agreement issuing the Guidelines for
Economic Development Poles for Wellbeing, published in the Official Gazette of the Federation on May 22, 2025.

The characteristics of the pole and surrounding municipalities are as follows:
I. Macrolocation: Zapotlán de Juárez, Hidalgo.
II. Communication and Connectivity: It has access to the Mexico–Pachuca federal highway and the Arco Norte. It is located 29 km from Felipe Ángeles International Airport and 12 km from Pachuca Airport. The property has access to Pemex pipelines 4 km away.
III. Population: 466,929 inhabitants in Pachuca de Soto and surrounding municipalities of Zapotlán de Juárez.
IV. Social Feasibility: The National Institute of Indigenous Peoples reported that no Indigenous community has been identified as having the right to consultation.
V. Educational: Higher and upper secondary education institutions in PODECOBI and surrounding municipalities.
VI. Territorial: The following are priority and potential productive vocations for the development of productive activities in the PODECOBI:
· Logistics
· Manufacturing
· Pharmaceuticals and medical devices
· Automotive
· Aerospace
VII. Industrial feasibility: The designated polygon is used for logistics, industrial, and services.
VIII. Sustainability: SEMARNAT (National Energy Agency) has determined that the project is environmentally viable, subject to compliance with applicable regulations. It is not located in Protected Natural Areas or on indigenous lands.
IX. Services and infrastructure: Close to the CENAGAS natural gas pipeline (4 km) and with electricity availability. It has direct access to road infrastructure and is close to key electrical substations. It is estimated that in its mature phase, this PODECOBI will reach an electricity demand of 20 MW.
X. Ownership: The land plots are publicly owned by the state.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private

STATUS

Stage
  Preinvestment
Substage
  Preparation
RELEVANT DATES

GEOLOCATION

State(s)
Hidalgo   

SPONSOR

Responsive image
Entity
Secretaría de Economía

ADDITIONAL INFORMATION

Responsive image
Source
Diario Oficial de la Federación
Description
A Constitutional Government of the United Mexican States Body, which has the function of publishing in the national territory: laws, regulations, agreements, circulars, orders and other acts issued by the powers of the Federation.

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice