Construction of the Second Line of the Guadalupe Victoria Aqueduct, in Ciudad Victoria, Tamaulipas.

Sector: Water and Environment


Last Revision

September 24, 2025
Short Name of the Project:
0977 Ciudad Victoria II Aqueduct
Type of Investment:
Greenfield
Subsector:
Water Supply
Asset (s):
 Aqueduct 750 litres per second (l/s), Supply Line 54.70 KM, Drinking Water Treatment Plant 1,500 litres per second (l/s), Tank 10,000 m3 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

2,062,000,000

Estimated Investment USD:

111,459,459

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Construction

DESCRIPTION

Construction of the second line of the Guadalupe Victoria aqueduct, 54.7 km long, to convey 750 lps per day (psi), thus supplementing the supply of water suitable for human use and consumption from a sustainable source that can meet current and future population demand. This will also improve the quality of the water supplied by replacing and modernizing the water treatment plant.

Components:
1. Conveyance line.
2. Intake structure at the Guadalupe Victoria Dam and its respective pumping equipment.
3. Water treatment plant.
4. Pumping stations 1 and 2 of the new conduction line.
5. Protection devices.
6. Storage tank.
7. Access road.

The goal is to reduce the consumption of drinking water for a population of 361,165, as well as generate savings by discontinuing the operation of the water treatment plant and water truck services.

LEGAL AND FINANCIAL STRUCTURE

Selection Process
Public Bid

STATUS

Stage
  Execution
RELEVANT DATES

GEOLOCATION

State(s)
Tamaulipas   

SPONSOR

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The project consists of the construction of the second line of the Guadalupe Victoria Aqueduct, designed to transport 750 liters per second and ensure the potable water supply to the inhabitants of Ciudad Victoria, Tamaulipas. Additionally, it contributes to sustainability by optimizing the use of surface water sources and reducing pressure on aquifers.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
Compras MX
Description
Compras MX is the Digital Public Procurement Platform of the Federal Public Administration, where anyone can access information about the purchases made by the Government of Mexico to support its operations for the benefit of all.
ID
LO-87-Y03-928010997-N-62-2025
Tendering process
ID
LO-16-B00-016B00985-N-39-2025
Tendering process
ID
LO-16-B00-016B00985-N-40-2025
Tendering process
ID
LO-16-B00-016B00985-N-41-2025
Tendering process
ID
AO-16-B00-016B00985-N-164-2025
Award
Responsive image
Source
State Government
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
28TM2022H0038
Permits
ID
28TM2025HD002
Permits, modification water treatment plant
Responsive image
Source
Transparencia Presupuestaria
Description
Digital platform used to monitor public expenditure, as well as the execution of public works throughout the country.
ID
2316B000036
Website

REMARKS

LO-87-Y03-928010997-N-62-2025 / Contractor: Construcciones Ayamonte, S.A. de C.V.
Second phase of the Guadalupe Victoria Water Treatment Plant (Stage 1) in Ciudad Victoria, Tamaulipas

LO-16-B00-016B00985-N-39-2025 / Contractor: Ingenieros Civiles de Sonora, S.A. de C.V. & GEOSYC Supervisión y Construcción, S.A. de C.V.
Construction of the conduction line from pumping plant 1 to delivery tank (km 29+889.07 to km 54+402.89).

LO-16-B00-016B00985-N-40-2025 / Contractor: Servicios Técnicos de Ingeniería, S.A. de C.V.
External supervision for the construction of the second line of the Guadalupe Victoria aqueduct in Ciudad Victoria, Tamaulipas (section from pumping station 1 to delivery tank).

LO-16-B00-016B00985-N-41-2025 / Contractor: Ingeniería Koala, S.A. de C.V.
External supervision for the construction of the second line of the Guadalupe Victoria aqueduct in Ciudad Victoria, Tamaulipas.