Project

EXECUTION OF WORKS: POWER SUPPLY FOR THE ADMINISTRATION OF THE NATIONAL PORT SYSTEM OF VERACRUZ (VERACRUZ II E.S. AND ASIPONA LOAD CENTER E.S.) IN THE STATE OF VERACRUZ.

Sector: Electricity


Last Revision

June 25, 2025
 
Short Name of the Project:
0969 CFE: SE Supply of Energy to the Administration of the National Port System of Veracruz
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 230 KV, Transformer Bank 30 MVA 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Extension,  Equipment

DESCRIPTION

The project consists of the construction of civil and electromechanical works for the power supply to the Administration of the National Port System of Veracruz:

- Veracruz II Electrical Substation (E.S.) : Expansion of the substation to include two 230 kV feeders for the transmission lines connecting this facility to the Asipona Load Center substation; construction of civil and electromechanical works for the two 230 kV feeders and one control booth.
- Asipona Load Center Electrical Substation (E.S.) : Installation of two three-phase transformer banks of 30 MVA each, with voltages of 230/13.8 kV; two 230 kV feeders for the transmission lines linking this facility with the Veracruz II C1 and Veracruz II C2 substations; and 16 feeders at the 13.8 kV voltage level.
The project includes supply, testing, and commissioning.

-The national content requirement for labor during the execution of the works shall be 90%, and for materials and permanently installed equipment, it shall be at least 13.86%.
-Unit price contract with price-based evaluation.
-The Federal Electricity Commission (CFE) will grant an advance payment each fiscal year in which the works are carried out, equivalent to 30% of the scheduled amount to be executed in each fiscal year.
-The maximum contract price at which CFE considers the award of the contract feasible is 361,202,486.98 MXN, excluding VAT.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Public Works
Selection Process
International Open Tender
Payment Source
Budgetary

STATUS

Stage
  Bidding
Substage
  Proposal Development
RELEVANT DATES
Request for proposals/Announcement June 24, 2025
Proposals Reception July 24, 2025
Ruling August 18, 2025
Contract Signing September 01, 2025
Execution/Construction Starting Date September 02, 2025
Term of the Contract July 28, 2026

GEOLOCATION

State(s)
Veracruz   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Héctor Omar Leal Nava
E-mail
omar.leal@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.
ID
CFE-0004-CACOA-0001-2025
Tender

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice