Project

DESIGN, CONSTRUCTION, OPERATION, Conservation, MAINTENANCE, AND Exploitation OF THE ENTRONQUE 75D-MATEHUALA HIGHWAY IN THE STATE OF SAN LUIS POTOSi

Sector: Transport


Last Revision

August 11, 2025
Short Name of the Project:
0965 Junction 75D-Matehuala Highway
Type of Investment:
Greenfield
Subsector:
Highways / bridges
Asset (s):
 Highway 118.40 KM-A4 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

20,102,659,386

Estimated Investment USD:

1,086,630,237

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Operation,  Maintenance,  Conservation,  Exploitation

DESCRIPTION

The project involves the design, construction, operation, preservation, maintenance, and management of the Entronque 75D-Matehuala Highway, classified as a Type A4 road, with a total length of 118.4 kilometers, located in the State of San Luis Potosí. The highway begins approximately at kilometer 61+200 of the federal highway MEX-057 San Luis Potosí – Matehuala and ends at the junction with the Matehuala Bypass.

It is a high-specification Type A4 highway featuring a 23.0-meter-wide section with four lanes, two in each direction, each lane measuring 3.5 meters in width. The highway includes 3.0-meter-wide outer shoulders and 1.0-meter-wide inner shoulders. The two directions of traffic are separated by a central barrier 1.0 meter in width.

Relevant components of the project: Villa de Arista, El Peyote and Matehuala junctions, toll plaza, ITS systems, signage, drainage and emergency ramps.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public / Private
Type of Contract
  State Concession
Term
40 years
Selection Process
Open Domestic Bidding
Payment Source
Project revenues
The main source of payment is the toll fees collected by the concessionaire.

STATUS

Stage
  Execution
Substage
  Pre-Execution Activities
RELEVANT DATES
Request for proposals/Announcement October 03, 2024
Proposals Reception November 18, 2024
Ruling November 28, 2024
Contract Signing December 16, 2024
Execution/Construction Starting Date 3rd Quarter 2025
Contractor
Infraestructura Potosina de Carreteras  
Major Contractor’s Shareholders
Promotora Mexicana de Autopistas Valoran, Grupo Valoran

GEOLOCATION

State(s)
San Luis Potosi   

SPONSOR

Responsive image
Entity
State Government
Department
Junta Estatal de Caminos
Subdirección de Proyectos y Licitaciones
Contact
Miguel Ángel Herrera Amaya
E-mail
jec_proyectos@slp.gob.mx

SUSTAINABLE INFORMATION

PROJECT’S SUSTAINABILITY SUMMARY

The project involves the design, construction, operation, conservation, maintenance, and exploitation of the Entronque 75D-Matehuala Highway, type A4, with a length of 118.4 kilometers, in the State of San Luis Potosí. Its goal is to promote economic integration and commercial exchange, improving transportation logistics, road safety, and reducing travel times.

* This summary was prepared based on the methodological framework defined by the Inter-American Development Bank (IDB) in the document entitled: “Attributes and Framework for Sustainable Infrastructure”, which is You can check Here.

Additionally, a brief explanation of the methodology and a summary of the questions applied can be consulted in this Document.

ADDITIONAL INFORMATION

Responsive image
Source
State Government
ID
LO-EST-247800015-15-2024
Tender site Concession title
Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
24SL2025V0017
Website

REMARKS

Benefits of the Project:
• Addresses the saturation and traffic congestion on Federal Highway 57
• Strengthens the USMCA corridor towards the northern border
• Will reduce the high number of accidents
• Will provide greater safety for users, especially freight trucks
• Will reduce travel time between San Luis Potosí and Matehuala by 30 minutes
• Will bring benefits to the communities within the project’s area of influence
• Will support the development of productive projects in local communities and ejidos

Follow the Project

Leave your e-mail to receive updates on this Project.

 I have read and I accept the Privacy Notice