Fonatur Roundabout in Baja California Sur: Investment of 469 Million MXN

N_Glorieta-Fonatur

The 1.5 km project consists of a grade-separated interchange, a signalized roundabout, and urban infrastructure including an inclusive pedestrian bridge, walkways, and sidewalks covering a total area of 19,500 square meters, a 3,000-square-meter bike path, public lighting, and traffic and pedestrian signals.

An investment of 469 million MXN will be allocated to the project, of which 200 million MXN are designated for the current year and the remaining 269 million MXN for 2026.

The project will benefit 2.6 million tourists who visit the region annually, as well as 351,000 residents of Los Cabos.

Source: Ministry of Infrastructure, Communications and Transport (SICT)

Go to press release

Project information