Project

DESIGN, CONSTRUCTION, EQUIPMENT, INSTALLATION, OPERATION AND MAINTENANCE OF A PHOTOVOLTAIC POWER PLANT, IN THE STATE OF AGUASCALIENTES.

Sector: Electricity


Last Revision

October 31, 2025
 
Short Name of the Project:
0703 CENACE. 3rd Long Term Power Auction (SLP 1/2017) Horus
Type of Investment:
Brownfield
Subsector:
Solar Power
Asset (s):
 Solar Farm 95 MW 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

2,033,000,000

Estimated Investment USD:

109,891,891

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Equipment,  Installation,  Operation,  Maintenance

DESCRIPTION

The project consists of the design, construction, equipment, installation, operation and maintenance of “Horus” photovoltaic power plant with a total production capacity of 95 MW in the state of Aguascalientes. The plant has the following features:
Power Zone: National
Export Area: “Occidental”
Price Area: Aguascalientes
Interconnection Zone: [Cañada–(KDA-230)-230]–93890-[La Bufa-230]

Canadian Solar Energy México, was assigned the following contract through CENACE's 2017 long-term power auction:

Contract number: SLP2017010102-009 related to:
- Energy for 206,017 MWHr/Year during 15 years and Renewable Energy Certificates (CEL) for 247,220 CEL/Year during 20 years, with an offered price of MXN$80,102,657

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Private
Type of Contract
  Assignment
Term
15 years
Selection Process
Public Auction
Financing Sources
Private
100 %
MXN
2,033,000,000
USD
109,891,891
Payment Source
Project revenues / Rate
The Clearing House is responsible for making the corresponding payments, derived from the following Electric Coverage Contracts with buyers and sellers:
- “Entidades Responsables de Carga” and the Clearing House
- Clearing House and the Generators

STATUS

Stage
  Operation
Substage
  < 5 years of operation
RELEVANT DATES
Request for proposals/Announcement May 08, 2017
Proposals Reception November 08, 2017
Ruling November 22, 2017
Contract Signing April 13, 2018
Execution/Construction Starting Date September 02, 2019
Operation Starting Date February 01, 2023
Term of the Contract 2035
Contractor
Horus Solar  
Major Contractor’s Shareholders
Canadian Solar

GEOLOCATION

State(s)
Aguascalientes   

Entity in charge of controlling the possession of communal land, as well as providing documentary legal security derived from the application of the Agrarian Law, and is the operator of the Geospatial Information System (SIG).

ADDITIONAL INFORMATION

Responsive image
Source
Secretaría de Medio Ambiente y Recursos Naturales
Description
Federal government entity and sectorial authority responsible for establishing the necessary criteria and instruments to guarantee the protection, preservation, and use of natural resources, by developing an environmental policy that ensures sustainable growth.
ID
01AG2018E0039
Permits
Responsive image
Source
Centro Nacional de Control de Energía
Description
Public entity whose objective is to exercise operational control over the national electric system and the operations of the wholesale electricity market, and to guarantee impartial access to the national transmission network and to the general distribution network
Responsive image
Source
Comisión Nacional de Energía
Description
Decentralized body of the Ministry of Energy that has technical and operational independence to regulate energy matters.
ID
E/1915/GEN/2017
Permit
ID
RES/959/2017
Resolution
ID
RES/637/2018
Resolution
Responsive image
Source
Concessionaire / Related Company

Follow the Project