Execution of works: Electrical distribution substation, high and medium voltage feeders and high voltage line, in the state of Chiapas.
Sector: Electricity
Last Revision
July 24, 2025
Short Name of the Project:
0410 CFE: 338 SLT 2020 Substations, Lines and Distribution Networks (Phase 8)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 115, Electric Power Transmission Line 1
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
Construction, Equipment, Installation