Project
Execution of works: electrical substations and transmission line, in the state of Guerrero.
Sector: Electricity
Last Revision
July 14, 2025
Short Name of the Project:
0408 CFE: 338 SLT 2020 Substations, Lines and Distribution Networks (Phase 5)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 115 KV, Power Station /Electrical Substation 115 KV, Electric Power Transmission Line 23.60 km-c
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
Design, Construction, Equipment, Installation