Project

DESIGN, CONSTRUCTION, EQUIPMENT AND INSTALLATION OF AN ELECTRICL SUBSTATION, TRANSMISSION LINE, A CAPACITOR AND TERMINAL EQUIPMENT IN THE STATE OF SINALOA.

Sector: Electricity


Last Update

September 30, 2018
 
Short Name of the Project:
0401 CFE: Transmission Lines System 1821 Distribution Divisions (Phase 7)
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 20 MVA, Electric Power Transmission Line 0.10 km-c, Capacitor 1.20 MVAr 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2019: $ 20
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

On December 1st, 2018, Mexico had a federal government administration change. As a consequence, all those projects that are in the pre-investment stage are subject to the confirmation of the new authorities.

Design, construction, equipment and installation of:

- 1 electrical substation with total capacity of 20 MVA, voltage ratio of 115 / 13.8 kV.
- 0.1 km-c (kilometers circuit) of high voltage line at 115 kV for its interconnection.
- 1 capacitor of 1.2 MVAr at voltage level of 13.8 kV.
- Terminal equipment for the interconnection.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
  Public Bid
Fuentes de financiamiento de inversión
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Project revenues
Financed Public Works Projects (FPW) are funded as follows: The developer is responsible for financing the project during construction, at the end of the works and once the project’s assets are ready to operate, the CFE makes the corresponding payment.

STATUS

Stage
  Preinvestment
Substage
  Preparation
RELEVANT DATES
Request for proposals/Announcement December 18, 2019

GEOLOCATION

State(s)
Sinaloa   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Empresa Productiva Subsidiaria Distribución
Contact
Ing. José Luis García Urresti
E-mail
luis.garcia@cfe.gob.mx

REMARKS

Project under review and analysis by the Federal Electricity Commission (CFE).