Project
Works for the construction of the Salamanca - 73120 - Salamanca South transmission line, replacement of primary equipment in 3 electrical substations and replacement of a gas-encapsulated substation sg4, of the Salamanca II CCC, in the state of Guanajuato.
Sector: Electricity
Last Revision
May 13, 2026
Short Name of the Project:
1070 CFE: Obras de Refuerzo de la CCC Salamanca II
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
Electric Power Transmission Line 5.42 km-c, Power Station /Electrical Substation 115 KV, Power Station /Electrical Substation 230 KV
Contract Currency:
Mexican Pesos MXNEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
Construction, Equipment, Installation