Project

Expansion of the San Quintín Substation, in the state of Baja California.

Sector: Electricity


Last Revision

January 20, 2026
 
Short Name of the Project:
1048 CFE: Expansion of the San Quintín Substation, Ensenada Zone
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 30 MVAr, 30 MVAr 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
  Design,  Construction,  Extension,  Equipment,  Installation

DESCRIPTION

Lump-sum works contract with price-based evaluation to address low-voltage issues in the southern part of the Ensenada Zone (P20-BC1). The project consists of the expansion of the San Quintín Substation through:
- Installation of a Static Synchronous Compensator (STATCOM) with a capacity of 30 MVAr capacitive and 30 MVAr inductive at a voltage level of 115 kV.
- Modernization of 115 kV bays to upgrade to a main-and-transfer bus arrangement, including line bays, transformer bank bay, transfer bay, and STATCOM bay.
- A temporary 226.42 m transmission line to divert the incoming Cañón–San Quintín transmission line and allow construction activities in the expansion area.
- A temporary 175.50 m transmission line to divert the incoming San Quintín–San Simón transmission line and allow construction activities in the expansion area.

The project scope includes the supply of permanent installation equipment and materials; development of engineering related to electromechanical and civil design concepts; execution of electromechanical and civil works; performance of pre-operational testing; preparation, analysis, and evaluation of the required studies (geotechnical studies, topographic surveys, census of underground installations, and apparent soil electrical resistivity); and the delivery of training and capacity-building programs.

National content requirements for the project:
- At least 90% domestic labor.
- A maximum of 49.91% in materials and permanent installation equipment used in the execution of the works.

CFE will grant an advance payment equivalent to 30% of the total contract amount.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Public Works
Selection Process
Open Domestic Bidding
Payment Source
Budgetary

STATUS

Stage
  Bidding
Substage
  Proposal Development
RELEVANT DATES
Request for proposals/Announcement January 19, 2026
Proposals Reception February 09, 2026
Ruling February 23, 2026
Contract Signing March 09, 2026
Execution/Construction Starting Date March 10, 2026
Term of the Contract June 02, 2027

GEOLOCATION

State(s)
Baja California   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Gerencia de Contrataciones de Obra

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
The Federal Electricity Commission (CFE) is a public company of a social nature that provides electricity, a fundamental service for the development of a nation. It is a productive state enterprise, exclusively owned by the federal government, with legal personality and its own assets.
ID
CFE-0004-CACON-0004-2026
Tender