Project
EXECUTION OF WORKS IN AN ELECTRICAL SUBSTATION AND IN A TRANSMISSION LINE, IN THE STATE OF CHIAPAS.
Sector: Electricity
Last Revision
November 26, 2025
Short Name of the Project:
1039 CFE: 363 SLT Electricity supply in the Los Ríos area Phase 1
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 100 MVA, Electric Power Transmission Line 0.30 km-c
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
Design, Construction, Equipment, Installation