Project

EXECUTION OF WORKS: ELECTRICAL SUBSTATION, MEDIUM AND HIGH VOLTAGE FEEDERS, HIGH VOLTAGE AND DISTRIBUTION LINES, IN THE STATE OF OAXACA.

Sector: Electricity


Last Revision

March 18, 2025
 
Short Name of the Project:
0963 CFE: 209 SE 1212 South - Peninsular (10th. phase)
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 115 KV, Electric Power Transmission Line 1,450 km-c, Distribution line 14.48 km-c, Feeder 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:
- 1 electrical distribution substation with a voltage of 115 kV, with a capacity of 9.375 MVA, 0.6 MVAr
- 2 high voltage feeders and 2 medium voltage feeders, including 0.3 km-C of 34.5 kV trunk lines.
- 1 overhead high voltage line of 1.450 km-C and 1 overhead distribution line of 14.475 km-C at 34.5 kV.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Budgetary

STATUS

Stage
  Preinvestment
Substage
  Preparation
RELEVANT DATES

GEOLOCATION

State(s)
Oaxaca   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Mtra. Erika Alejandra Enciso Macías
E-mail
gcia.contratacionesdeobra@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
The Federal Electricity Commission (CFE) is a public company of a social nature that provides electricity, a fundamental service for the development of a nation. It is a productive state enterprise, exclusively owned by the federal government, with legal personality and its own assets. It enjoys technical, operational, and managerial autonomy in accordance with the provisions of the Federal Electricity Commission Law.

REMARKS

The previous contest CFE-0003-CACOA-0015-2024 was declared void on Mar. 11, 2024.