Project
EXECUTION OF WORKS 358: TRANSMISSION LINE, IN THE STATES OF SAN LUIS POTOSi, HIDALGO AND STATE OF MEXICO.
Sector: Electricity
Last Revision
March 01, 2025
Short Name of the Project:
0936 CFE: Transmission Line System 358 Increase in transmission capacity in the northeast and center of the country stage 2
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
Electric Power Transmission Line
Contract Currency:
US DollarsEstimated Investment MXN:
5,362,043,035
Estimated Investment USD:
277,826,064
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
Design, Construction, Equipment, Installation