Project

EXECUTION OF WORK: SUBSTATIONS, IN THE STATES OF SAN LUIS POTOSI AND THE STATE OF MEXICO.

Sector: Electricity


Last Revision

September 12, 2025
 
Short Name of the Project:
0935 CFE: SLT 358 Increase in transmission capacity from northeast to center of the country, phase 1
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 230 KV, Power Station /Electrical Substation 400 KV 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2025: $ 18.5
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:

- 2 substations with operating voltage of 230 kV and 400 kV, with a total capacity of 875 MVA of transformation, 275 MVAr and 10 feeders (1 relocated): Jilotepec Potencia and Las mesas ampliación.

The works include the following concepts within their scope:
Supply of equipment and materials for permanent installation, development of the engineering associated with the concepts of electromechanical and civil design, execution of the electromechanical and civil works, conduction of pre-operational tests, preparation, analysis and evaluation of the required studies (geotechnical studies, topographic surveys and resistivity) and the delivery of training and education programs.

- Turnkey construction contract at a fixed price.
- The bidders must provide at least 90% of the local labor content and at least 30% of the total project value.
- The maximum contract price at which the CFE considers the contract awardable is USD $122,820,260.65.
- The Federal Electricity Commission (CFE) will not provide advances or payments during the project's execution.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Budgetary

STATUS

Stage
  Bidding
Substage
  Proposal Development
RELEVANT DATES
Request for proposals/Announcement September 11, 2025
Proposals Reception October 29, 2025
Ruling November 21, 2025
Contract Signing December 19, 2025
Execution/Construction Starting Date December 22, 2025
Term of the Contract June 14, 2027

GEOLOCATION

State(s)
State of Mexico, San Luis Potosi   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Antonio González Barrascout y Héctor Omar Leal Nava
E-mail
omar.leal@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
The Federal Electricity Commission (CFE) is a public company of a social nature that provides electricity, a fundamental service for the development of a nation. It is a productive state enterprise, exclusively owned by the federal government, with legal personality and its own assets. It enjoys technical, operational, and managerial autonomy in accordance with the provisions of the Federal Electricity Commission Law.
ID
CFE-0004-CACOT-0001-2025
Tender

REMARKS

Project ID: 2153TVV0003