Project

EXECUTION OF WORKS 359: SUBSTATIONS AND TRANSMISSION LINE, IN THE STATE OF SINALOA.

Sector: Electricity


Last Revision

April 23, 2024
 
Short Name of the Project:
0932 CFE: SLT 359 Congestion solution for GCR northwest, west and north transmission links phase 2 stage 1
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 5, Electric Power Transmission Line 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:

- 5 substations with operating voltage of 400 kV, with a total capacity of 75 MVAr, and 2 feeders; and
- 1 transmission line with system operating voltage of 400 kV and a total length of 213.3 km-Line and 213.3 km-Circuit.

The works include within their scope the following concepts: supply of equipment and materials for permanent installation, development of the engineering associated with the electromechanical and civil design concepts, execution of the electromechanical and civil works, performance of pre-operational tests, as well as the preparation, analysis and evaluation of the required studies (geotechnical studies, topographic surveys and resistivity) and the delivery of training and coaching programs.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Budgetary
The resources to fulfill the obligations arising from the execution of the Contract come from the Administration and Payment Source Trust number F/1320.

STATUS

Stage
  Bidding
Substage
  Deserted
RELEVANT DATES
Request for proposals/Announcement November 29, 2023
Proposals Reception March 04, 2024
Ruling April 22, 2024
Contract Signing May 03, 2024
Execution/Construction Starting Date May 07, 2024
Term of the Contract September 28, 2025

GEOLOCATION

State(s)
Sinaloa   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Mtra. Erika Alejandra Enciso Macías
E-mail
alejandra.encisom@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.
ID
CFE-0003-CACOA-0018-2023
Tender

Follow the Project

Leave your e-mail to receive updates on this Project.