Project

EXECUTION OF WORKS 352: SUBSTATIONS, DISTRIBUTION LINE AND TRANSMISSION LINES, IN THE STATE OF CAMPECHE.

Sector: Electricity


Last Revision

May 05, 2024
 
Short Name of the Project:
0928 CFE: Transmission Line System 352 Transformation and Transmission Querétaro, Isla del Carmen, Nuevo Casas Grandes and La Huasteca.
Type of Investment:
Brownfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 4, Electric Power Transmission Line 3 
Contract Currency:
Mexican Pesos MXN
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2024: $ 17.1
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:

- 4 substations with voltage of 34.5 kV, 115 kV and 230 kV, with a total transformation capacity of 350 MVA, and 10 feeders.
- 1 distribution line with a voltage of 34.5 kV.
- 3 Transmission Lines with a voltage of 230 kV and a total length of 37.40 km-Line and 142.3 km-Circuit.

It includes within its scope the following concepts: supply of equipment and materials for permanent installation, development of engineering associated with the concepts of electromechanical and civil design, execution of electromechanical and civil works, performance of pre-operational tests, as well as the preparation, analysis and evaluation of the required studies (geotechnical studies, topographic surveys and resistivity) and the delivery of training and coaching programs.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
International Open Tender
Financing Sources
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Budgetary

STATUS

Stage
  Preinvestment
Substage
  Preparation
RELEVANT DATES

GEOLOCATION

State(s)
Campeche   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios
Contact
Mtra. Erika Alejandra Enciso Macías
E-mail
alejandra.encisom@cfe.mx

ADDITIONAL INFORMATION

Responsive image
Source
Comisión Federal de Electricidad
Description
State owned productive company involved in power generation, transmission, distribution, commercialization and supply activities.

REMARKS

The previous contest CFE-0003-CACOA-0014-2023 was declared void on May. 06, 2024.