Project

EXECUTION OF WORKS 352: SUBSTATIONS, DISTRIBUTION LINE AND TRANSMISSION LINES, IN THE STATE OF CAMPECHE.

Sector: Electricity

PROJECT COMPLETED, CANCELED, OR WITHOUT CURRENT OR CONFIRMED INFORMATION

Last Revision

August 28, 2026
 
Short Name of the Project:
0928 CFE: Transmission Line System 352 Transformation and Transmission Querétaro, Isla del Carmen, Nuevo Casas Grandes and La Huasteca (Puerto Real)
Type of Investment:
Archived Project
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 4, Electric Power Transmission Line 3 
Contract Currency:
US Dollars
Estimated Investment MXN:

1,551,816,654

Estimated Investment USD:

80,405,008

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2026: $ 19.3
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

The project consists of the execution of the following works:

- 4 substations with voltage of 34.5 kV, 115 kV and 230 kV, with a total transformation capacity of 350 MVA, and 10 feeders.
- 1 distribution line with a voltage of 34.5 kV.
- 3 Transmission Lines with a voltage of 230 kV and a total length of 37.40 km-Line and 142.3 km-Circuit.

It includes within its scope the following concepts: supply of equipment and materials for permanent installation, development of engineering associated with the concepts of electromechanical and civil design, execution of electromechanical and civil works, performance of pre-operational tests, as well as the preparation, analysis and evaluation of the required studies (geotechnical studies, topographic surveys and resistivity) and the delivery of training and coaching programs.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Selection Process
Direct Awarding
Financing Sources
Private
100 %
MXN
1,551,816,654
USD
80,405,008
Payment Source
Budgetary

STATUS

Stage
  Operation
Substage
  < 5 years of operation
RELEVANT DATES
Request for proposals/Announcement June 19, 2024
Proposals Reception June 24, 2024
Ruling June 27, 2024
Contract Signing June 28, 2024
Execution/Construction Starting Date July 01, 2024
Term of the Contract September 17, 2025
Contractor
Sistindacema TMX y Active Rehab  

GEOLOCATION

State(s)
Campeche   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Subdirección de Contratación y Servicios

ADDITIONAL INFORMATION

Line
Source
Comisión Federal de Electricidad
Description
The Federal Electricity Commission (CFE) is a public company of a social nature that provides electricity, a fundamental service for the development of a nation. It is a productive state enterprise, exclusively owned by the federal government, with legal personality and its own assets.
Portfolio ID or Key
CFE-0003-ADCON-0006-2024
Procurement procedure

REMARKS

The previous contest CFE-0003-CACOA-0014-2023 was declared void on May. 06, 2024.