Description:
The project involves the execution of works within the framework of the Comprehensive Tourism Development Program “Acapulco se transforma contigo” related to the supply of drinking water, sanitation, flood protection, and infrastructure adaptation, benefiting 778,000 residents.
Drinking Water Infrastructure in the Municipality of Acapulco de Juárez Guerrero:
- Construction of 3 radial wells at the Papagayo II intake project
- Elevation of pumping equipment at supply sources
- Rehabilitation of the Papagayo I and 2 aqueducts
- Rehabilitation of 3 tanks and 3 pumping stations
- Rehabilitation of drinking water distribution networks
- Sectorization of the drinking water distribution network
- Improvement of drinking water service in Pie de la Cuesta
- Reconstruction of drinking water systems in rural communities
- Investment amount: 1,136.68 million pesos
Sponsor

Responsible Area
Subdirección General de Agua Potable, Drenaje y Saneamiento
SHCP Registry
2516B000016
Replacement of the Papagayo II Direct Intake Works by constructing three radial wells.
Compras MX
IO-16-B00-016B00985-N-58-2025 External supervision for the construction of the Papagayo II Aqueduct – La Sabana River crossing
IO-16-B00-016B00985-N-60-2025 Construction of the Papagayo II Aqueduct crossing – La Sabana River
Flood prevention infrastructure in the Municipality of Acapulco de Juárez Guerrero:
- Cleaning and dredging of 68 km of rivers and streams
- Reconstruction of 26 km of embankments, walls, sheet piling, and marginal protections
- Channelization of 13 km of the Seco, El Perro, and El Muerto streams
- Maintenance of silt retention dams and construction of 5 new dams
- Construction of the stormwater drainage system: Diamante area and pumping sumps
- Feasibility study for the construction of flood control dams
- Investment amount: 4,207.21 million pesos
Responsible Area
Subdirección General de Infraestructura Hidroagrícola

SHCP Registry
2516B000020
Conduct studies, executive projects, cleanup and dredging, maintenance, rehabilitation, reconstruction, and construction of protective works, silt retention structures, and flood control dams on rivers, streams, and bodies of water in the municipality of Acapulco de Juárez, Guerrero state.
Environmental Impact Assessment
12GE2025H0004 Project to restore the hydraulic section of the Arroyo el Muerto stream to increase its hydraulic capacity and reduce flood risks near the Emiliano Zapata neighborhood.
Compras MX
IO-16-B00-016B00985-N-61-2025 Reconstruction of a 220-meter-long bank with riprap protection along the right bank of the La Sabana River, including the restoration of drainage works, near the Costa Dorada neighborhood in Acapulco de Juárez, Guerrero state; and reconstruction of a 80-meter-long bank with riprap protection along the right bank of the La Sabana River, including the restoration of drainage works, near the Real del Palmar neighborhood.
LO-16-B00-016B00985-N-51-2025 Reinforcement of the bank with rockfill protection on the right bank of the La Sabana River, for an approximate length of 430 meters, at the height of the Joyas del Marqués II neighborhood, in the municipality of Acapulco de Juárez, state of Guerrero.
LO-16-B00-016B00985-N-52-2025 Construction of a protective dam on the left bank of the Colacho stream, approximately 1.6 kilometers long, near the Joyas Diamante subdivision.
LO-16-B00-016B00985-N-53-2025 Reinforcement of the bank with rockfill protection on the right bank of the La Sabana River, for an approximate length of 925 meters, upstream of the Metlapil Bridge.
IO-16-B00-016B00985-N-55-2025 Technical, administrative supervision, and quality control of the works consisting of the cleaning and dredging of the La Sabana River over an approximate length of 2.5 kilometers, from km 0+000 to km 2+500; cleaning and dredging of the La Sabana River over an approximate length of 2.5 kilometers, from km 2+500 to km 5+000; bank reinforcement with riprap protection on the right bank of the La Sabana River, over an approximate length of 925 meters, upstream of the Metlapil Bridge; and bank reinforcement with riprap protection on the right bank of the La Sabana River, over an approximate length of 430 meters.
IO-16-B00-016B00985-N-56-2025 Technical, administrative, and quality control supervision of the works consisting of the cleaning and dredging of the La Sabana River over an approximate length of 2.5 kilometers, from km 5+000 to km 7+500; cleaning and dredging of the La Sabana River over an approximate length of 2.5 kilometers, from km 7+500 to km 10+000; the reconstruction of the bank with riprap protection over 220 meters of the right bank of the La Sabana River, including the restoration of drainage works, at the height of the Costa Dorada colony; and the reconstruction of the bank with riprap protection over 80 meters of the right bank of the La Sabana River, including the restoration of drainage works.
IO-16-B00-016B00985-N-59-2025 Technical, administrative, and quality control supervision of the cleaning and dredging of the La Sabana River over an approximate length of 2.9 kilometers, from km 10,000 to km 12,960; and the construction of a protective dam on the left bank of the Colacho Stream, over an approximate length of 1.6 kilometers.
LO-16-B00-016B00985-N-43-2025 Protective and complementary works on both banks of the tributary stream of the Sabana River, in the section upstream of the El Quemado Bridge from km 0+240 to km 0+596.
IO-16-B00-016B00985-N-46-2025 Protective and complementary works on both banks of the tributary stream of the Sabana River, in the section upstream of the El Quemado Bridge from km 0+000 to km 0+240.
IO-16-B00-016B00985-N-91-2025 Cleaning and dredging of the main channels and storm drains in the bay of the municipality of Acapulco de Juárez.
IO-16-B00-016B00985-N-97-2025 Technical, administrative, and quality control supervision of the protective and complementary works on both banks of the tributary stream of the Sabana River, in the section upstream of the El Quemado Bridge from km 0+000 to km 0+240; protective and complementary works on both banks of the tributary stream of the Sabana River, in the section upstream of the El Quemado Bridge from km 0+240 to km 0+596; and the restoration of the hydraulic section through the construction of walls and incorporation structures in the storm drain on Mar de Filipinas Street, over a length of 250 meters.
IO-16-B00-016B00985-N-99-2025 Restoration of the hydraulic section by constructing walls and incorporation structures in the storm drain on Mar de Filipinas Street, over a length of 250 meters, in the San Agustín neighborhood, Acapulco de Juárez municipality.
Sanitation Infrastructure in the Municipality of Acapulco de Juárez, Guerrero:
- Rehabilitation of 16 WWTPs
- Rehabilitation of 10 collectors
- Rehabilitation of 2 pumping stations
- Construction of a purple line
- Investment: 1,711.04 million pesos
Responsible Area
Subdirección General de Agua Potable, Drenaje y Saneamiento

May 28, 2025 conference
"Acapulco se transforma contigo" May 9, 2025
“Escuchamos y Decidimos en Conjunto”
Sectur y Gobierno de Guerrero presentan la convocatoria de participación “Escuchamos y Decidimos en Conjunto”
Comunicado 062/2025.- El subsecretario de Turismo del Gobierno de México, Sebastián Ramírez Mendoza, anunció que se abrirá la convocatoria a un proceso de participación ciudadana denominado “Escuchamos y Decidimos en Conjunto”.
Conagua will invest 1.8 billion pesos in 2025
En el marco del programa Acapulco se Transforma Contigo, anunciado por la presidenta Claudia Sheinbaum, Conagua invertirá mil 800 MDP en 2025
“Estamos elaborando proyectos integrales para atender tres puntos: garantizar abasto de agua potable, obras para prevenir inundaciones y el saneamiento de diversos cuerpos de agua”: Efraín Morales López
Secretaría de Medio Ambiente y Recursos Naturales | 15 de febrero de 2025 | Comunicado de prensa
Decree creating the Inter-Secretarial Commission for the attention, reconstruction, and economic recovery of the municipalities of Acapulco de Juárez and Coyuca de Benítez
DECRETO por el que se crea la Comisión Intersecretarial para la atención, reconstrucción y recuperación económica de los municipios de Acapulco de Juárez y Coyuca de Benítez, en el Estado de Guerrero, dentro del Programa de Desarrollo Turístico Integral “Acapulco se Transforma Contigo”.
Diario Oficial de la Federación | 24 de enero de 2025