CONSTRUCTION AND INSTALLATION OF A ELECTRICAL SUBSTATION IN THE STATE OF CAMPECHE.
Sector: Electricity
This project is no longer updated
Last Revision
September 04, 2019
Short Name of the Project:
0417 CFE: Transmission Lines System 2120 Substations, Lines and Distribution Networks (Phase 5)
Type of Investment:
Archived Project
Subsector:
Transmission / Distribution
Asset (s):
Electric Power Transmission Line 1.60 km-c
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2019: $ 20
Contract Scope:
Construction, Installation