Project
DESIGN, CONSTRUCTION, EQUIPMENT AND INSTALLATION OF AN ELECTRICAL SUBSTATION, TRANSMISSION LINE AND TERMINAL EQUIPMENT IN THE STATE OF YUCATAN.
Sector: Electricity
This project is no longer updated
Last Revision
November 10, 2020
Short Name of the Project:
0238 CFE: Chichi Suarez Banco 1 Electrical Substation
Type of Investment:
Archived Project
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 300 MVA, Electric Power Transmission Line 25.20 km-c
Contract Currency:
US DollarsEstimated Investment MXN:
385,558,184
Estimated Investment USD:
18,993,014
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2022: $ 20.3
Contract Scope:
Design, Construction, Equipment, Installation