Project

DESIGN, CONSTRUCTION, EQUIPMENT AND INSTALLATION OF AN ELECTRICAL SUBSTATION, TRANSMISSION LINE, A CAPACITOR AND TERMINAL EQUIPMENT IN THE STATE OF SINALOA.

Sector: Electricity


Last Update

31/03/2019
 
Short Name of the Project:
0407 CFE: Transmission Lines System 2020 Substations, Lines and Distribution Networks (Phase 17)
Type of Investment:
Greenfield
Subsector:
Transmission / Distribution
Asset (s):
 Power Station /Electrical Substation 20 MVA, Electric Power Transmission Line 0.20 km-c, Capacitor 1.20 MVAr 
Contract Currency:
US Dollars
Estimated Investment MXN:

N.A.

Estimated Investment USD:

N.A.

Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2019: $ 20
Contract Scope:
  Design,  Construction,  Equipment,  Installation

DESCRIPTION

Those projects in the preinvestment stage published in Mexico Projects Hub are subject to change or confirmation by their sponsors.

Design, construction, equipment and installation of:

- 1 electrical substation with total capacity of 20 MVA, voltage ratio of 115 / 13.8 kV.
- 0.2 km-c (circuit kilometers) of high voltage line at 115 kV for its interconnection.
- 1 capacitor of 1.2 MVAr at voltage level of 13.8 kV.
- Terminal equipment for the interconnection.

LEGAL AND FINANCIAL STRUCTURE

Type of Project
  Public
Type of Contract
  Financed Public Works
Term
1 years
Selection Process
  Public Bid
Fuentes de financiamiento de inversión
Private
100 %
MXN
N.A.
USD
N.A.
Payment Source
Project revenues
In Public Financed Works (OPF for its acronym in Spanish), the developer is responsible for financing the project during the construction / execution stage. Once the project is delivered according to contractual terms and is in operating conditions, CFE pays the developer the agreed amount.

STATUS

Stage
  Preinvestment
Substage
  Studies
RELEVANT DATES
Request for proposals/Announcement
2020

GEOLOCATION

State(s)
Sinaloa   

SPONSOR

Responsive image
Entity
Comisión Federal de Electricidad
Department
Empresa Productiva Subsidiaria Distribución
Contact
Ing. José Luis García Urresti
E-mail
luis.garcia@cfe.gob.mx

REMARKS

The project is under review by the Federal Electricity Commission.