Project
DESIGN, CONSTRUCTION, EQUIPMENT AND INSTALLATION OF AN ELECTRIC SUBSTATION, TRANSMISSION LINE, A CAPACITOR AND TERMINAL EQUIPMENT IN THE STATE OF SAN LUIS POTOSi.
Sector: Electricity
This project is no longer updated
Last Revision
August 01, 2020
Short Name of the Project:
0391 CFE: Transmission Lines System 1821 Distribution Divisions (Phase 10)
Type of Investment:
Archived Project
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 30 MVA, Electric Power Transmission Line 5.24 km-c, Capacitor 1.80 MVAr
Contract Currency:
US DollarsEstimated Investment MXN:
N.A.
Estimated Investment USD:
N.A.
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2020: $ 20
Contract Scope:
Design, Construction, Equipment, Installation