Project
DESIGN, CONSTRUCTION, EQUIPMENT AND INSTALLATION OF ELECTRICAL SUBSTATIONS, TRANSMISSION LINES AND TERMINAL EQUIPMENT IN THE STATES OF JALISCO AND NAYARIT.
Sector: Electricity
This project is no longer updated
Last Revision
February 19, 2019
Short Name of the Project:
0389 CFE: Transmission Lines System 2020 Substations, Lines and Distribution Networks (Phase 2)
Type of Investment:
Archived Project
Subsector:
Transmission / Distribution
Asset (s):
Power Station /Electrical Substation 60 MVA, Control and Collection System 4.84 km-c
Contract Currency:
US DollarsEstimated Investment MXN:
170,251,920
Estimated Investment USD:
8,512,596
Exchange rate (USD/MXN) used by the Ministry of Finance for the economic plan 2019: $ 20
Contract Scope:
Design, Construction, Equipment, Installation